Pv powered 30kw installation manual


















For example, if the inverter IP address is Please contact the local network admin if this issue comes up. Skip to content Login Home. Monitoring PV Powered Inverters. Inverter Prerequisites Commercial PV Powered models come standard with the communications features necessary to integrate with WattMetrics.

The kit prices shown include hardware components only; click on any kit to add your choice of full-service installation options for rooftop or ground mount.

A 20kW solar kit requires up to 1, square feet of space. This could produce an estimated 2, kilowatt hours kWh of alternating current AC power per month, assuming at least 5 sun hours per day with the solar array facing South.

The highest output will be achieved with an unobstructed south-facing view of the sun for maximum solar power. The actual power generated will vary based on location, equipment and installation factors. Refer to your electric utility bill to find the actual kWh used per month and compare it to how much power these low cost 20kW PV systems can generate.

Products Per Page: 8 12 16 20 40 Columns: 1 2 3 4 6. Highest power and maximum yields. Installation concept ensures maximum yields. Intelligent integrated features. AC supply is not sufficient. Establishing a connection to the user interface Generally applicable access address: IP address manually assigned or assigned by the DHCP server router identification via network scanner software or network configuration of the router.

Enter password in the field Password. The standard password for user group Installer is pw Select [Login]. Select [Initialization]. Open drop-down menu Grid Standards Region and select the required country code.

Confirm changes with [Save Settings]. Updating the Firmware Select [Device] in the menu. Select [Firmware Update] in the sub-menu. Click [Select a Firmware File] and navigate to the update file fort he inverter.

Follow the instructions in the upcoming dialog. Keep the browser window open until the update is finished. Double-check the successful update via the menu [About]. One or multiple inverters can be registered as Modbus devices in the commissioning dialog. In the following step the country code can be selected for all connected devices. Procedure: Log into the user interface of the Data Manager. Select the menu item Device administration in the menu Configuration. Select the button.

Select Modbus devices and confirm with [Next]. Fill out the input fields and confirm with [Next]. Available Modbus devices in the system are searched for and displayed.



0コメント

  • 1000 / 1000